Fixture workflow
The controlled sequence that turns a store need into an approved, installed, inspected, changed, and retired fixture.
- Its bounded operating role is that it coordinates physical handoffs.
- Its evidence cannot cross this limit: it must retain condition exceptions.
- The fixture project lead should verify commissioning record before applying this definition to a live case.
