Project record
The Harvest record for a distinct project.
- ID: The number used to identify the project.
- Name: The name people see in Harvest.
- Client: The client attached to the project.
Imagine a textile lab where two sample runs both involve color matching. A colleague needs the hours for just one run. Harvest’s API lets software request a Tasks report with totals but no project IDs. A handoff needs to preserve enough detail to answer the question the recipient actually has.
Start with the tasks someone can track to on a Harvest project.
Tip: If the question names a particular project, start with an entry-level view filtered to that project.
Harvest identifies a project, a task and an assignment separately.
The Harvest record for a distinct project.
A named kind of work in the Harvest account.
A record pairing a specific project with a task.
A single record of logged time.
Context Harvest adds when you track using the button on an Asana task.
A Harvest report result grouped around a task.
Tip: If all you see is Color Matching, two projects may be using the same task.
A project can begin in Harvest or arrive through the Asana connection. Either way, the work people track depends on which tasks are available on that Harvest project.
The Asana task link supplies context about the work that prompted the entry.
The project and task sit on either side of the assignment in Harvest API v2.
For the lab, the assignment identifies where Color Matching belongs.
An API response can return a newly created record for inspection.
The returned record shows the project in its own field. If the lab expected Indigo Stripe and sees Natural Twill, a plausible number of hours doesn’t resolve the mismatch.
A task summary and an entry-level report give the reader different levels of detail.
A report filtered by project can narrow down the individual entries to inspect.
For corrections, the individual entry gives you a place to see the newly selected project and task.
In the enabled Enterprise log, the names tell you who corrected the entry and whose timesheet it was.
The project setup and authority to log and correct time are already in place. The lab uses Harvest to track Color Matching under two separate projects.
The lab is preparing Indigo Stripe and Natural Twill samples. Both runs include color matching. The colleague reading the Harvest Tasks API report has a total for that kind of work. They need to know how much belongs to Indigo Stripe.
The same task total could describe several splits between the runs. With no project ID on the API result, the colleague can’t isolate the Indigo Stripe hours from that result alone. The web task report’s Projects tab lets them look up Indigo Stripe separately.
Mina originally filed a stopped Color Matching entry under Indigo Stripe. Mina is already assigned to Ari, a Manager with permission to edit her time. The lab has authorized Ari to correct the unlocked entry. Ari changes its project to Natural Twill through Harvest’s API.
In the enabled Harvest Enterprise Timesheets log, Mina can see who changed her entry and a via API badge showing how the change was made. Mina and Ari have different roles in the same correction.
The links and labels you see can describe different parts of the handoff.
Harvest’s project import covers the project. The Harvest tasks still need to be added locally.
Harvest gives the task its own ID and gives its pairing with a particular project a separate assignment ID.
The link leads to the source task. The Harvest project and task selected when tracking determine where the entry is filed.
In Harvest’s enabled Enterprise log, the badge says the change came through the API. The badge alone names no integration.
Where Harvest’s Hide project codes setting is available and enabled, the Detailed time CSV leaves out that column. The code stays on the project and is still available through the API.
Tip: To find a project code, first see whether the export includes it.
How you start from Asana affects whether the Harvest entry carries a link.
It requires a start and end date and covers a window of up to 365 days.
The documented project sync runs from Asana to Harvest. A name change made in Harvest stays there under that sync.
Use the Harvest API v2 project assignments list for the currently signed-in user. It includes the project’s task assignments.
It comes from using the timer button on the Asana task with the extension enabled. Tracking from the browser extension’s toolbar leaves out the reference.
Harvest uses 422 for processing errors. Look at the response details for what happened on that request.
Click an hours total in Harvest’s in-app Time report to open the relevant Detailed time report and read the individual entries there.
In the Detailed time report, a Harvest Administrator can move multiple entries to the intended project together.
In the enabled Harvest Enterprise log, Performed by filters for the person who acted. Owned by filters for the person whose timesheet was affected.
Tip: For an older correction, keep the log’s viewing window in mind. Harvest documents up to six months in the enabled Enterprise activity log.
Start with the question the recipient needs answered. In the Harvest web task report, the project breakdown lets the lab answer how much of the task time belongs to each run.
When one entry looks misplaced, compare its returned project and task with the pair you expected.
Choose the Review Streets format that matches what you want to read next.
Go to the lists section for the broader Time Tracking Software category.
Go to the side-by-side comparison section for time tracking software.
Go to the buying guide section to continue researching time tracking software.
Choose a retailer
Prices checked regularly. We may earn a commission at no cost to you.
